+962 6 553 0031
|
info@jordanmesbar.com
عربي
About Us
Contact Us
Home
About
About Us
Certificates
Services
Geotechnical Investigation
Mining Exploration
Projects
Contact Us
Home
Projects
Projects
In Progress
Completed
WAJ Solar Power Plant /Al-Dulail – Al-Zarqa'a
Ajloun –Irbed Road part 2 & 4/
Dike 1- Remedial Measures – Construction of Cut-off Wall- Ch. 1+700 to Ch. 2+080
Kewar Solar Power Plant / AL-Jeza- Amman
Jordan Bank Solar Power Plant /Al-khalidiyya – Al- Mafraq
Al-Manakher Solar Power Plant /Sahab- Jordan
Jordan Road /Amman
Suweileh Terminal BRT –Project
Upgrading and Rehabilitation of Down Town Center First Stage Petra Province – Jordan
Military Tank Museum Proposed Buildings A&B Al-Muqabaleen – Amman
Royal Jordan Air Force Simulator Building (Training Facility
Foundation Inspection For Suweileh Bridge BRT – Project Suwaileh– Amman
Geotechnical Investigation for 750 KWP Solar PV System Ma’an –Jordan
Royal Jordan Air Force Simulator Building (Training Facility) Proposed Building, Al-Azraq – Jordan
Aqaba Water Company
Assessment of Salt Mushrooms
Na`ur Wastewater Treatment Plant
انشاء انكسات وهنجر معدني ومواقف للطائرا ت
The Exploration Drilling Results for Basalt Quarry
Al-Karak Dam Installation of Standpipe Piezometer
Sampling &Testing for Geotechnical Investigation for Oil Shale Project
The Exploration Drilling Results For limestone Quarry
Kofranja WWTP Treated Effluent Discharge Pipeline /Kofranja -Jordan
750 KWP Solar PV System Proposed structures, Al- Fugaige- Ma’an
Subsurface Investigation Works for Solar Pond Tabular Piles Ghor Al Safi-Jordan
Site Investigation for several privet building
Dike 18 / Replacing Damaged Instruments. /Safi – Southern Ghor
Construction of Pumping Station for Salt Tails to recover the KCL
Electrical Power saving Project Utilizing New Grinding And Packing Technologies Development
Subsurface Investigation Works for The Rehabilitation and Reinstatement Works of Dike 19.
Subsurface Investigation Works for The Rehabilitation and Reinstatement Works of Dike 19 at Pump Station Area Main contractor Hidroconstructia S.A.Buc
Additional Geotechnical Investigations - New Alignment For The Rehabilitation and Reinstatement Works of Dike 19 Main contractor Hidroconstructia S.A.
Jordan Water Framework Photovoltaic Plants (PV) For Pumping Station ZARA MA’IN PV PLANT ALGhour– Jordan
Load More...